PRS/muon meeting

Tuesday, 4 December 2001; 14.00:16.00

Room 40-S2-A01 Virtual Room:  SATURN

Agenda (preliminary, as on 2/12/2001):



 

Status of RPC L1 trigger code in ORCA                        G.Wrochna                15 min

Results on ME staging for eta > 2.1                                 D. Acosta                 15 min

L1 single mu, di-mu rates                                               H. Sakulin              15 min

L1 combined rates and threhsold optimization                   S.Arcelli                  15 min

Update of L2/L3 results on single and di- muon             N.Neumeister            15 min
topologies

L1-L2-L2.5  study for me*e and mu*tauj                         N.Amapane      15 min

L2 muon fitting using Pixel Hits                                      M.Konecki         15 min
 

Alignment software tools in ORCA  for trigger studies       F.Matorras           10 min

CSC reconstruction software                                 P.Moissenz/T.Cox (tbc)